1、Sintering Machine Heat Recovery Power Generation For HANDAN Steel Mill
This heat recovery power generation project is built for two sets of 360㎡ sintering machine in HANDAN steel mill, it is the first Sintering machine heat recovery power generation in China, general contracted with BOT mode by HBG, equiped with two sets of 68t/h Two-Pressure heat recovery boiler and one set of 25MW steam generator unit. The project has been put into operationin Apr. 2009.
2、Sintering Machine Heat Recovery Power Generation For ANYAN Steel Mill
This heat recovery power generation project in EPC mode is built for one set of 360㎡ and one set of 400㎡sintering machine in ANYANG steel mill, equipped with two units of Two-Pressure heat recovery boilers which is the first in China, and one set of 25MW steam generator unit.Tthe project has been put into operation in Sep. 2008.
3、CDQ Heat Recovery Power Generation For ANYANG Steel Mill
This heat recovery power generation project is general contracted with EPC mode by HBG, equipped with one set of 140t/h and 75t/h Two-Pressure CDQ heat recovery boiler which is a creation in the world, and one set of 15MW and 12MW steam generator unit. The project has been put into operation in Sep. 2009.
This heat recovery power generation project is general contracted with EPC mode by HBG, equipped with one set of 140t/h and 75t/h Two-Pressure CDQ heat recovery boiler which is a creation in the world, and one set of 15MW and 12MW steam generator unit. The project has been put into operation in Sep. 2009.
4、Sintering Machine Heat Recovery Power Generation For TAIYUAN Steel Mill
This heat recovery power generation project is built in EPC mode for one set of 450㎡ and one set of 600㎡sintering machine in ANYANG steel mill, equipped with two sets of Two-Pressure heat recovery boiler and steam generator unit, among which the heat recovery boiler for 600㎡sintering
machine is the largest in China. The 450㎡project has started operation in Oct. 2009, while the 600㎡project will start operation end of 2009.
This heat recovery power generation project is built in EPC mode for one set of 450㎡ and one set of 600㎡sintering machine in ANYANG steel mill, equipped with two sets of Two-Pressure heat recovery boiler and steam generator unit, among which the heat recovery boiler for 600㎡sintering
machine is the largest in China. The 450㎡project has started operation in Oct. 2009, while the 600㎡project will start operation end of 2009.
Heat Recovery Power Generation for Building Material Industry
1、Low Temperature Cement Kilns Heat Recovery Power Generation For ZHJIANG LEOMAX GROUP
This pure low temperature and pressure heat recovery power generation project is built for 5000t/d cement production line of ZHEJIANG LEOMAX Group, general contracted with EPC mode by HBG, equipped with one set of 9MW steam generator unit. The project has started operation in Sep. 2007.
1、Low Temperature Cement Kilns Heat Recovery Power Generation For ZHJIANG LEOMAX GROUP
This pure low temperature and pressure heat recovery power generation project is built for 5000t/d cement production line of ZHEJIANG LEOMAX Group, general contracted with EPC mode by HBG, equipped with one set of 9MW steam generator unit. The project has started operation in Sep. 2007.
2、Cement Kilns Heat Recovery Power Generation For KCC Cambodia
This heat recovery power generation project is built for 2500t/d cement production line in KCC Cambodia, general contracted with EPC mode by HBG, there are one set AQC and one set SP heat recovery boiler, one set 4.5 MW steam generator unit, the project have started running in Aug. 2009.
This heat recovery power generation project is built for 2500t/d cement production line in KCC Cambodia, general contracted with EPC mode by HBG, there are one set AQC and one set SP heat recovery boiler, one set 4.5 MW steam generator unit, the project have started running in Aug. 2009.